We have been an integral player in some of the largest and most delicate projects across the Middle East and Gulf regions like Burj Khalifa, Burj Al Arab, and the Louvre Museum. We plan to continue doing so in years to come.

Act One Act Two Downtown Dubai

Act One Act Two Downtown Dubai

2 zones total of 1420 of square meters to be cut, lifted, broken and carted away outside the site scope based on ground level of post tension slab. the client has decided to re-design this area and rebuild a higher level slabs from the existing one.

See project ...
Deira Water Front - Dubai

Deira Water Front - Dubai

Apply scaffold including design controlled demolition, using saw cutting machine, Robotic machines to breakRobotic machines to break manual breaking to expose the steel ate the parameter & construction away from the debris outside the site.

See project ...
Maryah Mall- Abu Dhabi

Maryah Mall- Abu Dhabi

Controlled demolition, and concrete cutting workd including scaffold lifting shifting and cart away.

See project ...
Redesign To Reconstruct concrete structure, Fountain raft, water tanks under ground, removal of Tiles, Ground Foundation, Slabs. Walls, columns, Beams

Confidential

Redesign To Reconstruct concrete structure, Fountain raft, water tanks under ground, removal of Tiles, Ground Foundation, Slabs. Walls, columns, Beams

See project ...
Seven City Mall JLT - Dubai

Seven City Mall JLT - Dubai

3 zones total of 38,000 of square meters to be cut, lift, crush and cart away outside the site scope based on two levels of post tension slabs beside 3 core walls.

See project ...
Burjuman Mall Expansion

Burjuman Mall Expansion

WEM has been called to execute our Hilti saw cutting of slabs/ walls and wire saw cutting for beams and columns, we used our sufficient resources to employ the necessaries Hilti cutting machines with our expertise

See project ...
Damac Merano Tower

Silicon park, Dubai

As WEM is a reputed demolition solution provider, China state awarded WEM other two contractors to execute the work.

See project ...
Demolition Project Marina, Dubai, UAE

Demolition Project Marina

Our value engineering came up with breaking down concrete piles as an essential part of the construction process. Therefore, our Robot Machine is the perfect solution with its superb power to weight ratio can deliver at least 6 piles a day. This can result in significant financial benefits & savings on the overall construction program.

See project ...
New York University

New York University

WEM has proven to be a strong player in the coring business not only by what we provide but how we provide it. With over 100 coring machines and a substantial team of specialists, working with WEM will guarantee fast and efficient results.

See project ...
Dubai Mall Expansion

Dubai Mall Expansion

Dubai Mall Expansion, Concrete Cutting , Drilling Works & Tunnel Controlled Demolition.

We created solutions for Dubai Mall suitable for its sensitive area where we able to deliver great results

See project ...
Sheikh Zayed Road

Sheikh Zayed Road

We employ modern technologies to cut through reinforced concrete. Our personalized solutions combined with over a decade of expertise in the field guarantee peace of mind at incomparable rates. We apply a non-vibration system to minimize vibrations to undetectable extremes.

See project ...
Hilton Abu Dhabi

Hilton Abu Dhabi

We employ advanced methodologies for controlled demolition works to ensure minimal vibration, clean terrains and extreme efficiency. We employ state of the art technologies in the field of controlled demolition with a combination between Saw cutting and Wire cutting and advance methodologies of breaking by utilizing robot hammer in order to avoid damage to surrounding structures, minimize production of dust and other disturbances and to facilitate debris removal.

See project ...
Tiara United Towers

Tiara United Towers

Diamond Concrete Cutting of RC Slabs, Columns, and Walls in addition of Cutting of Foundation opening using plunge pulley cutting and a special hydraulic system to remove the cut pieces.

See project ...
Dubai Opera House

Dubai Opera House

Cutting of RC Slabs and Beams plus Ramps in the Boulevard Car Park modifications. Specific material and machinery are used for the parking height restrictions.

See project ...
Damac Merano Tower

Damac Merano Tower

Special Cutting and Demolition of RC Foundation with depth up to 4M in order to add new piles for Merano Tower and retaining of 400mm of the water proof membrane intact all over the perimeter for the overlapping in later stage.

See project ...
Deira Water Front - Dubai

DHE mall access from Umm Suqeim bridge - Dubai

Cutting and chipping of bridge decking slab along with the barriers for 235M length. For DHE mall access from Umm Suqeim bridge.

See project ...