Call Us (+971) 26741642
[email protected]
Menu
Home
About Us
About WEM
Certificates
Service
Decommissioning
Controlled Demolition
Conventional Demolition
Strip Out Services
Brokk Demolition
Concrete Cutting
Deep Hole Coring
Core Drilling
Contemporary Robot Machineries for Breaking
Removal of Crane Foundation
Whaler Beams
Projects
Rentals
Brokk 160 Robotic Demolition
Husqvarna DXR 300 Demolition Robots
Gallery
FAQ
Contact
WEM Gallery
Home
WEM Gallery
Images
Videos
Dubai mall fashion avenue extension, removal floor by floor using diamond wire and sawing.
Dubai mall fashion avenue, Removal beams in the car park using wire sawing & 15T industrial forklift for dismantles.
Decommissioning 3
Using saw cutting machines on the parameter in-order to avoid vibration, and robotic machine to break the slab.
Breaking a collapsed slab using robotic machines, saw cutting on the perimeter & manual breaking to expose the steel for construct new slab.
Shows full support slab to do safe Robotic Demolition.
Conventional Demolition 1
Conventional Demolition 2
Conventional Demolition 3
Dubai mall temporary tunnel overhead Brokk breaking application.
Brokk Demolition 2
Brokk Demolition 3
Concrete Cutting 1
Concrete Cutting 2
Concrete Cutting 3
Deep Hole Coring 1
Deep Hole Coring 2
Deep Hole Coring 3
Core Drilling 1
Core Drilling 2
Core Drilling 3
Contemporary Robot Machineries for Breaking 1
Contemporary Robot Machineries for Breaking 2
Contemporary Robot Machineries for Breaking 3
Removal of Crane Foundation 1
Removal of Crane Foundation 2
Removal of Crane Foundations 3
Whaler Beams 1
Whaler Beams 2
Whaler Beams 3
Vertical cutting ongoing for a whaler beam using HILTI wire sawing machine
Machine fixing and horizontal cutting ongoing for a whaler beam using HILTI wire sawing machine
Lifting concrete cut pieces using fixed hooks for safety lifting purposes
Saw Cutting / Floor Sawing
Seven City JLT, Cluster Z, Jumeirah Lake tower
Deira Waterfront - Controlled Demolition for collapse Slab
Controlled Demolition for collapse slab in Deira Waterfront
Seven City Mall JLT - Project brief by Waleed Murr Regional Project Director of WEM
Vertical wire sawing
WEM awarded the biggest project in GCC
WEM, When brands becomes a matter
Waleed Murr Head of sales and partner Explaining the strengths and capabilities of WEM